Project
IMAN bank evening: a round stage under a truss ring
A bank evening for partners and investors in a hotel ballroom in Tashkent. Sound, video and content were ours; the stage, trusses, lighting and screens were installed by partners under our coordination.

- cameras in the hall
- 4
- days of installation
- 2
- crew members on site
- 18
Our figures. The stage, lighting and screens came from partners; who did what is set out below.
Passport
One evening, one hall, guests all around the stage
First the scale of the evening, then what we installed and ran.
2025
17 April · hotel ballroom
A round stage in the middle of the hall, rows of chairs in a circle, a truss ring with lights above the stage.
Event scale
- guests
- ≈ 600
- screens
- 2
Our production
- cameras
- 4
- days of installation
- 2
- crew
- 18
The guest count is approximate, based on the seating. Screens, stage and lighting belong to partners and are not in our figures.

Our part
What we did: sound, video and content, with partners working to our plan
Our engineers ran our systems. Partners installed the stage, trusses, lighting and screens, and we answered for them to the bank.
Our own
Hall sound
A sound engineer at the console all evening, radio microphones for the host and speakers, two spares charged and tuned.
Yamaha DM3
Our own
Cameras and video direction
Cameras around the round stage: the speaker in close-up on the screens from any side of the hall. Every camera is recorded separately.
Blackmagic ATEM · HyperDeck
Our own
Content to the evening’s script
Holding slides, videos and presentations on the screens, cued to the script. A second machine with copies of all files switches over in seconds.
Our own
Coordinating partners
One technical plan and one installation schedule for everyone. One technical lead for the bank and for the hotel’s staff.
From partners
Round stage and truss ring
Partners built the stage and trusses to our technical plan: rigging points, walkways to the stage, camera positions.
From partners
Lighting and screens
Lighting and both screens came from partners. The signal to the screens was ours; we tuned the picture to their size together at the run-through the day before.
How we prepared
How we prepare an evening in a hotel hall
One hall and one evening, but the same order as at a forum.
Site visit and plan
We survey the hall 7–10 days ahead, draw a technical plan with the wiring and agree it with the hotel’s chief engineer 5 days ahead.
Installation
Partners’ installation goes into one schedule with ours: who enters the hall when, where cables run, where cameras stand.
Run-through
The day before we test sound, cameras, screens and content, with the host if the script allows. On the day, again, 2 hours before the start.
The evening
Our engineer at every desk, the technical lead in touch with the organiser from start to finish.
Dismantling and recordings
We strip down the same night and hand the hall back with a signed record and photos. Rough recordings the same day, edited ones within 3 working days.
Next project
Tashkent International Investment Forum
2022–2026 · Tashkent
Every forum since the first: direction in every hall, screens, simultaneous interpretation, content and streams.

Request
Tell us about your event — we reply within an hour
Anything else — ask at the consultation.
